1. I.P.
STATION
247.5 MW coal based power station was installed and
commisioned in 1968. While according to the environmental
clearance by Ministry of environment and Forest (MOEF) to the
Pragati Power Project, they imposed a condition that I.P.
Station should be decommissioned with six months from the date
of commissioning of Pragati Power Project.
However, Considering the fastrise of power requirement
of Delhi. DPCC has now allowed to run I.P. Station units
subject to maintaining stack emission below 50
mg/NM3 and zero discharge from ash ponds for which
action has been initiated.
2. RAJGHAT POWER HOUSE
It has installed capacity of 2x67.5=135 MW. Both the
units are performing well. Additional ESPs are being fitted to
bring down the SPM level from 150 mg/NM3 to 50
mg/NM3.
3. GAS TRIBUNE POWER
STATION
It has installed capacity of 282 MW. Due to gas
restriction only 4 gas turbines and 2 steam turbines are
generally in operation. Two gas turbines alongwith one steam
turbine are kept on liquid fuel to meet any
emergency.
UNDER PPCL ONE POWER
STATION IS IN OPERATION :
PRAGATI POWER STATION
a) Gas Turbines 2x104 MW (open cycle) b) Steam
Turbine of 1x122MW (combined cycle)
|