UNDER IPGCL 2 POWER STATIONS ARE IN OPERATION :

1. RAJGHAT POWER HOUSE

It has installed capacity of 2x67.5=135 MW. Both the units are performing well. Additional ESPs are being fitted to bring down the SPM level from 150 mg/NM3 to 50 mg/NM3.

2. GAS TRIBUNE POWER STATION

It has installed capacity of 270 MW. Due to gas restriction only 4 gas turbines and 2 steam turbines are generally in operation. Two gas turbines alongwith one steam turbine are kept on liquid fuel to meet any emergency.

UNDER PPCL ONE POWER STATION IS IN OPERATION :

PRAGATI POWER STATION

a) Gas Turbines 2x104 MW (open cycle)
b) Steam Turbine of 1x122MW (combined cycle)