1.
I.P. STATION
247.5 MW coal based power station
was installed and commisioned in 1968. While
according to the environmental clearance by
Ministry of environment and Forest (MOEF) to the
Pragati Power Project, they imposed a condition
that I.P. Station should be decommissioned with
six months from the date of commissioning of
Pragati Power Project.
However, Considering the fastrise
of power requirement of Delhi. DPCC has now
allowed to run I.P. Station units subject to
maintaining stack emission below 50 mg/NM3 and
zero discharge from ash ponds for which action has
been initiated.
2. RAJGHAT POWER
HOUSE
It has installed capacity of
2x67.5=135 MW. Both the units are performing well.
Additional ESPs are being fitted to bring down the
SPM level from 150 mg/NM3 to 50 mg/NM3.
3. GAS
TRIBUNE POWER STATION
It has installed capacity of 282
MW. Due to gas restriction only 4 gas turbines and
2 steam turbines are generally in operation. Two
gas turbines alongwith one steam turbine are kept
on liquid fuel to meet any emergency.
UNDER
PPCL ONE POWER STATION IS IN OPERATION
:
PRAGATI
POWER STATION
a) Gas Turbines 2x104 MW (open
cycle)
b) Steam Turbine of 1x122MW (combined
cycle)